The 90-day plan review builders and tradespeople actually need.

What a proper quarterly review covers, how it differs from a catch-up in the van, and the three things to reset before the next 90 days start.

A 90-day review is not a chat about how busy the last quarter felt. It is a short, structured look at the three priorities you set 90 days ago, whether each one actually moved, why, and what that means for the next three. Most building and trades businesses that have a plan at all wrote it once in January and have not opened it since — the review is the step that turns a one-page plan from a document into a habit.

For a builder or tradesperson, the review needs its own shape because the usual version, built for an office business with steady weeks, does not survive contact with weather, subcontractors and jobs that straddle two quarters. Below is what to check, what tends to go wrong, and how to run the 90 minutes without it turning into either a pep talk or a telling-off.

What should a proper 90-day review actually cover?

A review that is worth the 90 minutes covers four things, in this order, for each of the three priorities you set last time:

That is the whole review. No more than three priorities carried forward at a time — a list of eight intentions is not a plan, it is a wish list, and it fails the same way every quarter: everything gets a little attention and nothing gets finished.

Why is this harder to run in a building or trades business?

Three things make the standard version of this review a poor fit straight out of the box.

First, the calendar does not cooperate. A kitchen fit-out or an extension frequently starts in one quarter and finishes in the next, so "what happened this quarter" has to be read against jobs that are still mid-flight, not treated as a clean 90-day box. Second, the weather and subcontractors move the numbers for reasons that have nothing to do with the plan — three wet weeks or a plasterer who stops answering the phone will hit the figures regardless of how good the priority was. Third, the owner is usually also the estimator, the first call for problems on site and often still swinging a hammer some days, so the review itself has to be booked like a job, with a start time and an end time, or it never happens at all.

None of that means skip the review. It means read the numbers knowing why they moved before deciding what to do about it, and protect the 90 minutes the way you would protect a client meeting, because nobody else is going to protect it for you.

An illustration, not a client. A general building contractor runs three priorities through a quarter: cut quote turnaround from 9 days to 3, reduce rework call-backs from 1 in 6 jobs to 1 in 10, and lift average job margin from 18% to 22% by pricing variations properly instead of absorbing them. At the 90-day review: quote turnaround is down to 4 days (close, and the cause is clear — a simple pricing template cut the admin time on each quote), call-backs are flat at 1 in 6 (the cause is one subcontractor whose snagging rate is well above the other two, not the process), and margin is up to 20% (moving, but £2,400 of variations were still absorbed rather than invoiced across the quarter). The decision: keep the quoting target with a tighter number, drop the general call-back target and replace it with a specific one — move that subcontractor off the next three jobs and reassess — and keep the margin target, adding a one-line rule that no variation starts without a signed-off price first.

What goes wrong when the review gets skipped?

The plan quietly stops being the plan. Priorities drift without anyone deciding to drift them — by month five the business is chasing whatever job is loudest that week, which feels productive and is not the same as moving the three things that were agreed to matter most. The team, if they ever heard the original priorities, has no idea whether they landed, so good decisions on site do not get reinforced and poor ones do not get corrected. And the owner loses the one piece of evidence that would show whether last quarter's changes actually worked, because nobody wrote down what happened before memory smoothed it over. Three quarters later the business is in the same place it was at New Year, having worked every week of it.

How do you actually run the 90 minutes?

Book the date at the end of the current quarter, not when a gap happens to appear in the diary — a genuinely quiet 90 minutes rarely turns up on its own. Do it off-site, phone away, and keep to the four steps above for each priority before writing the next three. Bring the figures with you rather than trying to recall them in the room: last quarter's invoices for quote turnaround and average job value, the job sheets or a simple spreadsheet for call-backs, and the accounts for margin. If a site manager or lead tradesperson is close to the work, bring them in for the parts that affect the team, and leave anything about an individual's pay or performance for a separate conversation. Finish with the next three priorities on one page, each with a number and a date, pinned up or saved somewhere it will actually be seen before the following review.

That one-page plan is worth building properly before you try to review it — 90-Day Planning covers how to pick the three priorities and turn each into weekly actions. If a full quarter feels too long a gap between check-ins, The Monthly Business Review is the same discipline run every four weeks instead of every twelve. And Now, Where, How is the three-question model worth using inside the review itself: where the business actually is, where it needs to get to, and the moves that close the gap.

This is also the rhythm behind Performance on Purpose and the fortnightly work in Business Coaching — the review done with somebody in the room asking what actually happened, not just what you meant to do.

Andy Jackson is Co-Founder of Buzz and the author of Performance on Purpose: build the person, develop the leader, improve the business. He writes about the method at andyjackson.com, where the courses and books sit alongside it.

Get the next one in your inbox

One practical guide for business owners each week. Unsubscribe at any time.

Frequently asked questions

Is a 90-day review different from a weekly site meeting or a monthly numbers chat?

Yes, and a building or trades business usually has both of the others already. A weekly site meeting is about this week's jobs, labour and materials. A monthly numbers chat with your accountant is about what has already happened to cash and margin. Neither asks whether the three things you said mattered most this quarter actually moved, or why. The 90-day review sits above both: it takes the priorities you set, checks each one against what really happened, and decides what carries into the next quarter and what gets dropped. Keep all three rhythms — they answer different questions.

What if the business clearly missed its targets for the quarter?

That is exactly what the review is for, so treat it as information rather than a verdict. Separate three causes: the target was wrong for the conditions (a run of wet weeks, a supplier price rise), the plan was right but execution slipped (quotes went out late, call-backs were not chased), or the priority was never really worked on once the quarter got busy. Each has a different fix — rebase the target, fix the specific breakdown, or decide honestly whether it is still the right priority. Carrying a missed priority into next quarter unexamined is worse than missing it once.

How does a builder fit a proper review in during a busy summer or a wet winter?

Book the date before the busy period starts, not when there is a gap in the diary, because a genuinely quiet 90 minutes rarely appears on its own. Pick a day that falls between jobs rather than mid-fit-out, do it off-site away from the phone and the van radio, and timebox it to 90 minutes so it does not compete with a full working day. Trades businesses that skip the review in a busy quarter are usually the ones that most needed it, because busy and profitable are not the same thing, and busy hides the difference.

Should the review just be the owner, or does the team need to be in the room?

The owner does the preparation — pulling the numbers and drafting what moved — but the decisions land better with whoever is closest to the work in the room for part of it. A site manager or lead tradesperson often knows exactly why a priority stalled before the figures confirm it, and hearing the next quarter's three priorities explained rather than announced makes them far more likely to stick on site. Keep pay, personal performance and anything about an individual's future out of this meeting; that belongs in a separate one-to-one.